- Under NSE's graded surveillance, stage 0, on the list for 23 Oct 2026. The exchange puts a share here when its price has moved unusually, and trading in it carries extra conditions.
- Delivery only: shares bought must be paid for in full, with no selling on the same day.
- Market capMarket capitalisation. Share price times the number of shares: what the whole company is worth at the day's price. The rank is by average market value over the six months to Jun 2026, among listed companies.
- ₹328 Cr1,887th largest listed
- P/EPrice to earnings, trailing. Market cap divided by the profit of the last twelve months (the latest four quarters, or two half years for a company that reports half-yearly) that belongs to the company's own shareholders, after the share of the other owners of its subsidiaries: what investors pay for each rupee of a year's profit.
- Lossover the last 12 months
- P/BPrice to book. Market cap divided by the net worth that belongs to the company's own shareholders, its assets less everything it owes and less the other owners' share of its subsidiaries, on its latest balance sheet.
- Net worth zero or below
- Dividend yieldDividend yield. Dividends paid per share in the twelve months to the day, as a percentage of the day's share price.
- Nonein the last 12 months
- ROEReturn on equity. Profit over the last twelve months (the latest four quarters, or two half years for a company that reports half-yearly) that belongs to the company's own shareholders, as a percentage of their net worth, the money they have in the business.
- Net worth zero or below
- ROCEReturn on capital employed. Operating profit after depreciation (revenue less operating expenses and depreciation, without other income and one-off items) as a percentage of all the money the business runs on: the whole group's net worth, the other owners of its subsidiaries included, plus borrowings. Lease liabilities are not counted: the results filings do not state them. The profit is over the last twelve months (the latest four quarters, or two half years for a company that reports half-yearly); net worth and borrowings are on the latest balance sheet. The filing of 14 Aug 2026
- −2.5%
- Debt to equityDebt to equity. Borrowings divided by the whole group's net worth, the other owners of its subsidiaries included: rupees borrowed for each rupee of equity in the business. Lease liabilities are not counted: the results filings do not state them. From the balance sheet at the end of Mar 2026.
- Net worth zero or below
- Volume, NSEVolume. Shares traded on the last trading day.
- 3,82,110
GVK Power & Infrastructure share news and announcements
740 announcements, routine notices left out, newest first. Page 13 of 15.
Feb 2011
24 Feb · Updates
GVK Bagodara Vasad Expressway Private Limited, a step down subsidiary of the company, has signed a Concession Agreement on February 21, 2011 with Gujarat State Road Development Corporation for Six Laning of existing three lanes of Bagodara -Wataman - Tarapur - Vasad Road Project (State Highway No.8, Km 0/0 to Km 101/9) in the State of Gujarat on BOT Basis. The Concession Agreement is for a period of 27 years including construction period of 30 months.4 Feb · Updates
Company has signed a Memorandum of Understanding (MOU) on February 03, 2011 with the Punjab State Power Corporation Limited in connection with the implementation of Phase-II, 1320 MW Power Project by GVK Power (Goindwal Sahib) Limited, a step down subsidiary of the company, in the State of Punjab.
Jan 2011
31 Jan · Results
Consolidated Results for the quarter ended on 31-DEC-2010 as follows: Net Sales of Rs. 45956 lacs for quarter ending on 31-DEC-2010 against Rs. 50343 lacs for the quarter ending on 30-SEP-2010. Net Profit / (Loss) of Rs. 4191 lacs for the quarter ending on 31-DEC-2010 against Rs. 4281 lacs for the quarter ending on 30-SEP-2010.31 Jan · Results
Standalone Results for the quarter ended on 31-DEC-2010 as follows: Net Sales of Rs. 823 lacs for quarter ending on 31-DEC-2010 against Rs. 1346 lacs for the quarter ending on 30-SEP-2010. Net Profit / (Loss) of Rs. (52) lacs for the quarter ending on 31-DEC-2010 against Rs. 6133 lacs for the quarter ending on 30-SEP-2010.25 Jan · Updates
Vide its letter dated January 25, 2011 that "GVK Power and Infrastructure Limited (GVKPIL), today has signed two Memorandums of Understanding (MoUs) with the Government of Indonesia to develop green field international airports in North Bali and Yogyakarta, Java. The MoUs were signed in the presence of H.E. Dr H Susilo Bambang Yudhoyono, President of the Republic of Indonesia who is currently on a State visit to India. The MoU for the Bali airport is a three-way agreement between Badan Koordinasi Penanaman Modal (BKPM - a board set up by the Government of Indonesia for the facilitation of domestic and foreign investment), PT Pembangunan Bali Mandiri (a special purpose vehicle for airport development,) and GVKPIL. The MoU for the Java airport is an agreement between Angkasa Pura I (the Government of Indonesia owned airport operations and management company), BKPM and GVKPIL".12 Jan · Board meeting
Inter alia, to consider and take on record the Un-audited financial results of the Company for the quarter and nine Months ended December 31, 2010.6 Jan · Updates
GVK Deoli Kota Expressway Private Limited ("GVKDKEPL"), a step-down subsidiary of our Company, which is augmenting the existing Deoli-Kota Section of National Highway (NH) No. 12 from Km 165.00 to Junction of NH - 76 on Kota Bypass (approximately 83.04 Km) in the State of Rajasthan by four laning on design, build, finance, operate and transfer (DBFOT) basis ("Project"), has signed the financing documents on January 5, 2011 with a consortium of lenders. The Project Cost is Rs. 823.4 Crores which would be financed by means of equity of Rs.164.7 Crores and term loan of Rs. 658.7 Crores. As per the Concession Agreement executed by GVKDKEPL with National Highways Authority of India ("NHAI"), the Concession Period for the Project is 26 years including Construction Period of 30 months
Dec 2010
16 Dec · Updates
Gvk Power & Infrastructure Limited (GVKPIL), one of India's leading infrastructure developers today signed an agreement with Actis Infrastructure India PCC Limited and an affiliate of the Government of Singapore Investment Corporation (GIC) for an investment of Rs.349 crores each in GVK Energy Limited, a wholly owned subsidiary of GVKPIL. With this development, the overall PE investment in GVK Energy Limited has now gone upto Rs.1498 crores and the overall dilution would be at 24.97%. Actis and GIC's affiliate will bring in Rs 218 crores each as the first tranche of investment into the company
Nov 2010
8 Nov · Updates
Company, today i.e. on November 08, 2010 has signed an agreement with M/s. 3i India Infrastructure Fund (established by international private equity firm 3i Group Plc) to lead an investment of Rs.1200,00,00,000 (Rupees Twelve hundred Crores) for a minority stake (21.10%) with 3i investing an amount of Rs. 800 Crores in GVK Energy Limited, a wholly owned subsidiary of the company.
Oct 2010
30 Oct · Results
Standalone Results for the quarter ended on 30-SEP-2010 as follows: Net Sales of Rs. 1346 lacs for quarter ending on 30-SEP-2010 against Rs. 1285 lacs for the quarter ending on 30-JUN-2010. Net Profit / (Loss) of Rs. 6133 lacs for the quarter ending on 30-SEP-2010 against Rs. 973 lacs for the quarter ending on 30-JUN-2010.30 Oct · Results
Consolidated Results for the quarter ended on 30-SEP-2010 as follows: Net Sales of Rs. 50343 lacs for quarter ending on 30-SEP-2010 against Rs. 48986 lacs for the quarter ending on 30-JUN-2010. Net Profit / (Loss) of Rs. 4281 lacs for the quarter ending on 30-SEP-2010 against Rs. 3339 lacs for the quarter ending on 30-JUN-2010.13 Oct · Board meeting
Inter alia, to consider and take on record the Un-audited financial results of the Company for the quarter and half year ended September 30, 2010.
Aug 2010
24 Aug · Updates
7,03,25,000 (4.45%) equity shares of Re. 1/- each held by Late Shri Somanadri Bhupal, Promoter Director of the Company were transmitted (on 23.08.2010) equally to his children i.e., Mr. Krishna Ram Bhupal (3,51,62,500 equity shares) and Ms. Shriya Bhupal (3,51,62,500 equity shares) as per his Will. The BSE vide its Letter No. DCS/AMAL/RCG/GEN/386/2010-11 dt. 16.07.2010 has approved the transmission of the said shares, which will continue to be under lock-in for the residual period i.e. upto 06.11.2010. As a result of the above transmission, the respective share holding of Mr. Krishna Ram Bhupal and Ms. Shriya Bhupal have increased from 0.34% to 2.56% each
Jul 2010
31 Jul · Results
Consolidated Results for the quarter ended on 30-JUN-2010 as follows: Net Sales of Rs. 48986 lacs for quarter ending on 30-JUN-2010. Net Profit / (Loss) of Rs. 3339 lacs for the quarter ending on 30-JUN-2010.31 Jul · Results
Standalone Results for the quarter ended on 30-JUN-2010 as follows: Net Sales of Rs. 1285 lacs for quarter ending on 30-JUN-2010. Net Profit / (Loss) of Rs. 973 lacs for the quarter ending on 30-JUN-2010.9 Jul · Meeting
Register of Members and Share Transfer Books of the Company will remain closed from July 23, 2010 to July 31, 2010 (both days inclusive) for the purpose of Annual General Meeting of the Company scheduled to be held on July 31, 2010.8 Jul · Board meeting
Inter alia, to consider and take on record the Un-audited financial results of the Company for the quarter ended June 30, 2010.2 Jul · Updates
The GVK Ratle Hydro Electric Project Private Limited (SPV), a step down subsidiary of the company has signed the Power Purchase Agreement on 30-06-2010 with Power Development Department, Govt. of Jammu & Kashmir for implementing the 690 MW Ratle Hydro Electric Project on the river Chenab, Kishtwar District, in the State of Jammu & Kashmir.
Jun 2010
1 Jun · Updates
GVK Developmental Projects Private Limited, a wholly owned subsidiary of our Company has won the bid for four laning i.e. starting from Km 165.00 to Junction of National Highway No.76 on Kota Bypass on the Deoli-Kota Section of the National Highway No.12 in the State of Rajasthan, India on BOT basis under the National Highways Development Program (Phase Ill). The estimated cost of the project is around Rs.850 Crores. The said project will be implemented by GVK Deoli Kota Expressway Private Limited which has been incorporated as a special purpose vehicle (Concessionaire), which has signed the Concession Agreement with the National Highways Authority of India on May 17, 2010.
May 2010
10 May · Updates
Company has acquired the entire equity share capital of GVK Transportation Private Limited on May 10, 2010. As a result, GVK Transportation Private Limited has become a wholly owned subsidiary of the Company.
Apr 2010
30 Apr · Management
Board of Directors of the company at its meeting held on April 30, 2010 has appointed Mr. S Balasubramanian, as Additional Director of the Company. Further, Company has submitted to the Exchange a copy of the extracts of minutes of the meeting of the Board of Directors of the Company. A copy of the same shall be available on the NSE website (http://www.nseindia.com) under Corporates > Latest Announcements and on the Extranet Server (/Common/Corporate Announcements). For more details click here.30 Apr · Results
Consolidated Results for the year ended on 31-MAR-2010 as follows: Net Sales of Rs. 178664 lacs for year ending on 31-MAR-2010 against Rs. 51378 lacs for the year ending on 31-MAR-2009. Net Profit / (Loss) of Rs. 15587 lacs for the year ending on 31-MAR-2010 against Rs. 10756 lacs for the year ending on 31-MAR-2009.30 Apr · Results
Standalone Results for the year ended on 31-MAR-2010 as follows: Net Sales of Rs. 4537 lacs for year ending on 31-MAR-2010 against Rs. 2614 lacs for the year ending on 31-MAR-2009. Net Profit / (Loss) of Rs. 2168 lacs for the year ending on 31-MAR-2010 against Rs. 2100 lacs for the year ending on 31-MAR-2009.28 Apr · Updates
GVK Coal (Tokisud) Company Private Limited, a wholly owned subsidiary of our Company which is developing 'Tokisud North Sub- Block' coal mine in South Karanpura Coalfield situated in District Hazaribagh, State of Jharkhand, has signed the financing documents today i.e. April 27, 2010 with the Consortium of Lenders thereby achieved its financial closure. The Project Cost is Rs. 300 Crores which is financed by means of equity of Rs.75 Crores and debt of Rs. 225 Crores. IDBI Bank Limited has syndicated the debt apart from being one of the Lenders in the Consortium of Banks20 Apr · Board meeting
Inter alia, to consider and take on record the Audited financial results of the Company for the year ended March 31, 2010.
Mar 2010
29 Mar · Disclosure
Dr. G V Krishna Reddy, Chairman and Managing Director of Company (promoter Director) stating that he proposes to gift 36,90,00,000 equity shares (23.37%) having a face value of Re.1 each to his spouse Mrs. G Indira Krishna Reddy, Promoter Director, through a gift. Further the Company has submitted to the Exchange a copy of Regulation 3(1)(e)(ii) and 3(3) of SEBI (Substantial Acquisition of Shares and Takeovers) Regulations, 1997, as amended. A copy of the same shall be available on the NSE website (http://www.nseindia.com) under Corporates > Latest Announcements and on the Extranet Server (/Common/Corporate Announcements). For more details click here.29 Mar · Business
The Company, after completing all the required formalities with the concerned, has acquired 6,25,75,082 (9.50%) equity shares of Rs.10/- each in GVK Gautami Power Limited, a Subsidiary of the Company from Nagarjuna Constructions Company Limited. As a results of this acquisition, the equity holding of the Company in GVK Gautami Power Limited has been increased to 63.60%10 Mar · Updates
GVK Developmental Projects Private Limited, a wholly owned subsidiary of the Company has won the bid to develop 690 MW Rattle Hydro Electric Project on river Chinab, Kishtwar district, in the State of Jammu and Kashmir on Built, Own, Operate and Transfer (BOOT) basis. The estimated cost of the said project is around Rs.5,000 Crores and targeted for Commissioning by 2017.
Feb 2010
1 Feb · Updates
GVK Power (Goindwal Sahib) Limited, a wholly owned subsidiary of our Company which is implementing 540MW Coal based thermal power project at Goindwal Sahib, Taran Tarn District, in the State of Punjab, has signed all the financing documents today i.e., 01.02.2010 with the consortium of Lenders thereby achieved its financial closure. The Project Cost is Rs.3,200 Crores which is financed by means of equity of Rs.800 Crores and debt of Rs.2,400 Crores. IDBI Bank Limited has syndicated the debt apart from being one of the Lenders in the Consortium of Bankers
Jan 2010
30 Jan · Results
Consolidated Results for the quarter ended on 31-DEC-2009 as follows: Net Sales of Rs. 47350 lacs for quarter ending on 31-DEC-2009 against Rs. 49232 lacs for the quarter ending on 30-SEP-2009. Net Profit / (Loss) of Rs. 4580 lacs for the quarter ending on 31-DEC-2009 against Rs. 4423 lacs for the quarter ending on 30-SEP-2009.30 Jan · Results
Standalone Results for the quarter ended on 31-DEC-2009 as follows: Net Sales of Rs. 1133 lacs for quarter ending on 31-DEC-2009 against Rs. 1141 lacs for the quarter ending on 30-SEP-2009. Net Profit / (Loss) of Rs. 658 lacs for the quarter ending on 31-DEC-2009 against Rs. 841 lacs for the quarter ending on 30-SEP-2009.13 Jan · Board meeting
Inter alia, to consider and take on record the Un-audited financial Results of the Company for the quarter and nine months ended December 31, 2009.
Dec 2009
7 Dec · Business
GVK Power & Infrastructure Limited (GVKPIL) proposes to acquire 6,53,82,000 shares being 17% of the paid up equity share capital of Bangalore International Airport Limited (BIAL) at a total cost of Rs.686,51,10,000 (Rupees Six hundred eighty six crores fifty one lac ten thousand only) from L&T Infrastructure Development Projects Limited through a step down wholly owned subsidiary of GVKPIL. The above acquisition will be completed upon obtaining necessary consents. The earlier acquisition of 12% equity shares in BIAL from Flughafen Zuerich AG is also being done through the same step down wholly owned subsidiary of GVKPIL instead of GVK Airport Developers Private Limited (GVKADPL).7 Dec · Business
Company proposes to acquire 6,53,82,000 shares being 17% of the paid up equity share capital of Bangalore International Airport Ltd. (BIAL) at a total cost of Rs. 686,51,10,000 (Rupees Six hundred eighty six crores fifty one lac ten thousand only) from L&T Infrastructure Development Projects Limited through a step down wholly owned subsidiary of GVKPIL. The above acquisition will be completed upon obtaining necessary consents. The earlier acquisition of 12% equity shares in BIAL from Flughafen Zuerich AG is also being done through the same step down wholly owned subsidiary of GVKPIL instead of GVK Airport Developers Pvt. Ltd. (GVKADPL).
Nov 2009
23 Nov · Results
Minutes of the results of Postal Ballot duly signed by Dr. G V Krishna Reddy, Chairman & Managing Director of the Company for raising the funds through FCCB/FCEB/QIP/Equity/Debentures/Convertible Warrants etc., or such other permissible securities in one or more tranches up to an amount not exceeding Rs.1,800 Crores (inclusive of any green shoe option), along with a Report of the Scrutinizer appointed by the Board to conduct the Postal Ballot process. A copy of the same shall be available on the NSE website (http://www.nseindia.com) under Corporates > Latest Announcements and on the Extranet Server (/Common/Corporate Announcements). For more details click here.5 Nov · Business
The Board of Directors of the company, at its meeting held today, the 5th November, 2009 has approved the acquisition of 4,61,52,000 shares being 12% of paid up equity share capital of Bangalore International Airport Limited (BIAL) at a total cost of Rs.484,59,60,000 (Rupees Four Hundred Eighty Four Crores Fifty Nine Lacs and Sixty Thousand Only) from Flughafen Zuerich AG through GVK Airport Developers Pvt. Ltd. (GVKADPL), a wholly owned subsidiary of GVK Power & Infrastructure Ltd. (GVKPIL). The above acquisition will be completed upon obtaining necessary consents. The company has also entered into a Strategic Alliance Agreement (SAA) with Unique Airports Worldwide AG (Zurich Airport) to collaborate for new airport projects in Indian Sub-Continent
Oct 2009
30 Oct · Results
Consolidated Results for the half year ended on 30-SEP-2009 as follows: Net Sales of Rs. 82452 lacs for half year ending on 30-SEP-2009. Net Profit / (Loss) of Rs. 7696 lacs for the half year ending on 30-SEP-2009.30 Oct · Results
Standalone Results for the half year ended on 30-SEP-2009 as follows: Net Sales of Rs. 1995 lacs for half year ending on 30-SEP-2009. Net Profit / (Loss) of Rs. 1026 lacs for the half year ending on 30-SEP-2009.30 Oct · Results
Consolidated Results for the quarter ended on 30-SEP-2009 as follows: Net Sales of Rs. 49232 lacs for quarter ending on 30-SEP-2009 against Rs. 33220 lacs for the quarter ending on 30-JUN-2009. Net Profit / (Loss) of Rs. 4423 lacs for the quarter ending on 30-SEP-2009 against Rs. 3273 lacs for the quarter ending on 30-JUN-2009.30 Oct · Results
Standalone Results for the quarter ended on 30-SEP-2009 as follows: Net Sales of Rs. 1141 lacs for quarter ending on 30-SEP-2009 against Rs. 854 lacs for the quarter ending on 30-JUN-2009. Net Profit / (Loss) of Rs. 841 lacs for the quarter ending on 30-SEP-2009 against Rs. 185 lacs for the quarter ending on 30-JUN-2009.21 Oct · Meeting
In terms of section 81(1A) and 192A of the Companies Act, 1956 read with the Companies (Passing of the Resolution by Postal Ballot) Rules, 2001 of the Companies Act, 1956, raising of funds through equity / debt requires the approval of shareholders by way of a Special Resolution, through a postal ballot. Special Resolution pursuant to Section 81(1A) read with Section 192A of the Companies Act, 1956 to raise funds through FCCBs / FCEBs / QIP / Equity / Convertible Warrants / Debentures. A copy of the postal ballot notice shall be available on the NSE website (http://www.nseindia.com) under: Corporates > Latest Announcements and on the Extranet Server (/Common/Corporate Announcements). For more details click here.16 Oct · Board meeting
Inter alia, to consider and take on record the Un-audited financial Results of the Company for the quarter and half year ended September 30, 2009.14 Oct · News Verification
News Verification : The media had reports that GVK Power & Infrastructure Limited may acquire 13% stake from Bidvest Group to increase its stake in Mumbai Airport to 50%. The Exchange, in order to verify the accuracy or otherwise of the information reported in the media and to inform the market place so that the interest of the investors is safeguarded, had written to the officials of the company. GVK Power & Infrastructure Limited has vide its letter inter-alia stated," As of date, the Company has not entered into any purchase contract for acquiring the stake in Mumbai International Airport Private Limited. Further, we are not aware of the source of this information."